What to Decide Before a Kitchen Remodel Starts

Most kitchen remodels do not go sideways because of bad work. They go sideways because a decision got made late. A cabinet order goes in, the boxes arrive, and then you change your mind about the island. Now you are waiting weeks for replacement parts and paying for the first set.

This post is about which decisions have to be locked before anyone picks up a hammer, and what it actually costs you to reverse them once the job is moving.

The layout is the first and biggest decision

Everything else follows the layout. Where the sink goes, where the range goes, where the refrigerator goes. Those three points drive plumbing, gas, electrical, and venting.

If you keep the layout, the work stays mostly above the floor. Cabinets come out, cabinets go in, and the rough plumbing and wiring stay close to where they already are. That is the cheaper path and the faster one.

If you move the sink to a window or push the range to an island, you are now cutting into the floor or the ceiling below. In a lot of Centennial homes that means working in a finished basement, so there is drywall repair and sometimes a soffit to deal with. On a slab, moving drains is a bigger job again.

Decide this before cabinets are ordered. Changing a layout after cabinet drawings are approved usually means a new order, a restocking charge or a total loss on the first one, and a schedule reset measured in weeks.

Walls, and whether you are opening one

Opening a kitchen to a dining or living room is one of the most common requests we see. It is also the decision that needs the most lead time.

If the wall carries load, you need a beam, you need posts to carry it down, and you need a permit and engineering. That is not a change you make on a Tuesday because the kitchen felt tight once the cabinets came out. It changes the ceiling, the flooring transition, and often the HVAC runs inside the wall.

Have the wall question answered before demolition. If you think you might want it open later, say so early. Framing the job with that in mind costs far less than coming back to it.

Cabinets, because they set the clock

Cabinets are the long lead item on nearly every kitchen. Stock lines move fastest. Semi custom takes longer. Full custom takes longer still, and local shops have their own queue.

Once the order is placed, the design is frozen in a practical sense. Door style, finish, box sizes, drawer configuration, and hardware boring are all part of that order. A change to any of it after production starts is a change order against the manufacturer, not against us, and their rules govern.

Here is what to settle before the order goes in:

  • Door style and finish, chosen from a physical sample in your own kitchen light, not from a screen
  • Where you want drawers instead of doors, especially near the range
  • Whether you want a pantry cabinet, and what it has to fit
  • Appliance sizes, in writing, with model numbers
  • Island size and whether it has seating, a sink, or a cooktop
  • Hood type, because a chimney hood and a cabinet insert need different cabinets above the range

That last pair matters more than people expect. Appliance specs and hood type drive cabinet dimensions. Buying the range after the cabinets are built is how you end up with a filler panel where you wanted a sleek fit.

Countertops cannot be ordered early

Countertops get templated after cabinets are set. That is not a scheduling choice, it is how the trade works. The template has to match real installed boxes, not a drawing.

So plan for a gap. Cabinets go in, the template happens, fabrication takes time, then the tops arrive and the sink and faucet get hooked up. During that window you have a kitchen with no counters and no running water at the sink.

You can shorten the gap by picking your slab and your edge detail early, and by having the sink and faucet on site before the template. You cannot eliminate it.

Decide how you will live during the work

This is a decision, not a side effect. A full kitchen remodel means weeks without a working kitchen. Some of that time there will be no water at the sink and no range.

Figure out now where the microwave and the coffee maker will live. Decide if you are setting up a temporary sink in the laundry room or in the basement. Decide whether the refrigerator stays in place or moves to the garage, and remember that a garage in a Centennial winter is cold enough to affect it.

People who plan this are fine. People who do not plan it start pushing for shortcuts in week two.

What changing your mind actually costs

There are three costs to a late change, and only one of them is money.

The first is the material you already bought. Custom and semi custom cabinets are generally not returnable. Fabricated stone is not returnable. Tile ordered to quantity may be, minus a fee.

The second is the labor already spent. If drywall is patched and painted and then a new outlet is needed, that patch gets opened again. The work gets paid for twice.

The third is the schedule. This is the one that hurts most. Crews and suppliers get booked in sequence. Pull one piece out of order and the next slot may be weeks out. A two day decision delay can turn into a three week calendar delay, and nothing you do speeds that back up.

How to protect yourself

Spend longer on the planning than feels necessary. Walk the taped out layout on your own floor. Stand where the dishwasher will be and open the imaginary door. Confirm appliance models before cabinets are ordered. Look at finish samples at night under the lights you actually use.

Then commit, and let the work run. The homeowners with the smoothest remodels are not the ones with the biggest budgets. They are the ones who made the hard calls before demolition day.